Example Information Requirements

Example table below; however, it is recommended to list these as structured requirements in the Scope module.

ITEM DESCRIPTION FORM FORMAT MILESTONE
Asset Register List of maintainable assets XLSX COBie 2.4 schema Eight weeks prior to asset operation or by Handover (whichever is earliest)
Carbon Report Embodied carbon values for all new assets


Energy Use Energy usage of equipment


U-values Wall, roof and floor U-values


Utilities Cost Information Whole facility monthly energy cost, whole facility annual energy cost


OS Map With a red line to denote the site boundary, the wider estate including campus A to be marked out in blue


Sub-contractor List



Construction Programme



Spatial Information



O&M Manual



Project Directory



Testing, Commissioning and Completion Information



Building Management Systems Commissioning Certificates



Fire safety reports and certificates



Heating System Test Reports and Certificates



Manufacturers Product Data Sheets



Operating Instruction for Assets



As Constructed Information



Control System Record Drawings



Electrical System Record Drawings



Fire System Record Drawings



Mechanical System Record Drawings



Architectural Record Drawings



Guarantees and Warranties



Maintenance Schedules